Now showing 1 - 2 of 2
  • Some of the metrics are blocked by your 
    PublicationAccess status: Open Access ,
    Data on the current state of problem solving and improvement during physical product development within complex (manufacturing) systems
    Due to the exponential increase of failure cost during the product development process, problems have to be effectively remedied as early as possible and with shortened innovation cycles, increasingly efficient. For the manufacturing of complex products at low maturity levels (referred to as physical product development), nonconformance problem solving constitutes a major difficulty in this regard (Camarillo et al., 2017; Walter et al., 2010). The data presented in this article was collected from German companies, differing in size and industry sector, manufacturing highly complex products at low maturity. Selected and consulted companies therefore operate in (or comparable to) the automotive prototyping, air and space, shipbuilding, special machinery or electronics domain. The survey comprises the answers of 46 participants, gathered via online questionnaire. It subdivides into 18 questions covering the companies’ characteristics, knowledge management and documentation systems within the product development process, as well as the appraisal of technological potentials. The obtained data gives an insight into the industrial status quo of nonconformance problem solving. The data allows to derive existing deficits and dedicated research on solutions.
    Source Type:
      316  110
  • Some of the metrics are blocked by your 
    PublicationAccess status: Open Access ,
    Machine learning-based prediction of missing components for assembly - a case study at an engineer-to-order manufacturer
    For manufacturing companies, especially for machine and plant manufacturers, the assembly of products in time has an essential impact on meeting delivery dates. Often missing individual components lead to a delayed assembly start, hereinafter referred to as assembly start delayers. Identifying the assembly start delayers early in the production process can help to set countermeasures to meet the required delivery dates. In order to achieve this, we set up 24 prediction models on four different levels of detail utilizing different machine learning-algorithms - six prediction models on every level of detail - and applying a case-based research approach in order to identify the model with the highest model quality. The modeling approach on the four levels of detail is different. The models on the coarsest level of detail predict assembly start delayers utilizing a classification approach. The models on the three finer levels of detail predict assembly start delayers via a regression of different lead times and subsequent postprocessing operations to identify the assembly start delayers. After training of the 24 prediction models based on a real data set of a machine and plant manufacturer and evaluating their model quality, the classification model utilizing a Gradient Boosting classifier showed best results. Thus, performing a binary classification to identify assembly start delayers was the best modelling approach. With the achieved results, our study is a first approach to predict assembly start delayers and gives insights in the performance of different modeling approaches in the area of a production planning and control.
    Source Type:
      2  9